Artelye team templating a countertop installation
01Our process / from quote to installation

A clear way forward

Quote. Template. Fabricate. Install.

One accountable path from rough scope to finished stone—with technical checks at every handoff.

Five steps. Zero mystery.

Your Artelye representative guides you from rough quote to template, drawing, final pricing, production, and installation. The work moves forward when the next detail is resolved.

Your project roadmap

What to expect.

Dates depend on project readiness, material availability, approvals, and the agreed scope of work.

  1. 01Rough quote
  2. 02Template & assess
  3. 03Drawing review
  4. 04Final quote
  5. 05Production & install
01

Receive a rough quote

Send us your measurements or plans and material preferences. We use that information to prepare an initial quote for the expected scope.

02

Template and assess the job

We send a templater to measure the space, review site conditions, and assess the complete job scope. This is where the details needed for an accurate final drawing and quote are confirmed.

03

Review the production drawing together

We turn the measured dimensions and project details into a final production drawing, then walk through it with you to answer questions, coordinate changes, and make sure it reflects your vision before the work is released.

See how the drawing review works
04

Confirm final pricing and release the work

After the template, site assessment, materials, edges, cutouts, removal, access, and other project details are confirmed, we send the final quote and pricing for your approval. Once confirmed, the project enters production.

05

Fabricate, schedule installation, enjoy

We fabricate the approved pieces, set your installation date, and dispatch the finished countertops. Our crew installs the work and completes the final walkthrough—then you can enjoy your new countertops.

See how installation works

Scope, readiness & possible fees

Know what belongs in the quote.

Not every item below creates an added charge. These categories show what is included in project planning, what may affect price, and what must be ready before our team can proceed.

01

Fabrication service

Sink and specialty cutouts

Sink cutouts carry an additional fabrication fee. Any applicable cutouts should be identified in the written quote before production.

Shown in your quote
02

Templater assessment

Cabinet leveling

Our templater will identify whether the cabinets are level and flag any condition that needs attention. On installation day, our installers use leveling measures to achieve the best possible fit. Countertop installation takes serious skill—there is one chance to set it right.

Reviewed during templating
03

Optional service

Removal and disposal

Removing and disposing of existing countertops is an additional service. Confirm whether it is included in the agreed scope before work begins.

Selected before scheduling
04

Required readiness

Secure cabinets and supports

We cannot finalize or install onto cabinets, supports, or bases that are loose or not securely mounted. This is a safety and quality requirement, not an automatic fee.

Must be complete before arrival

Before our crew arrives

Please prepare a clear, safe workspace.

For the safety of our installation team and everyone in your home, please keep children, pets, trash, and other obstructions clear of the work area and access route. A clear space helps us provide a safe, efficient, high-quality installation.

Category 05 · Special handling and site access

Conditional installation fee

Large pieces need a safe route in.

A 20+ square-foot island is not automatically an extra charge. Added handling may apply when stairs, tight turns, long carries, or limited entry points require more installers, protection, time, or planning.

If access affects pricing, we review the route before fabrication and identify the work in your quote.

  • Direct entrancePreferred route
  • Stairs or tight turnsMay require added handling
  • Large-format piecesReviewed with the access plan

Homeowner add-on services

Current plumbing & service pricing.

These current add-on prices apply to qualifying residential homeowner projects only. They do not apply to Builder, Commercial, Custom Builder, or Lowe’s work.

Plumbing

Basic disconnection

$100

Completed by Artelye installers.

Plumbing

Basic reconnection

Confirm current price

Reconnects existing plumbing items except appliances, Insta-hots, and filtration systems.

Cooktop

Reconnection

  • Electric: $275
  • Gas: $300

Cooktop

Disconnection

$450

Gas or electric. Must be completed by the plumber before installation day.

Trip fee

Standard or reduced

$250 Standard$150 When multiple qualifying add-on services, including plumbing, are performed

Step 01 · Scope the work

Start with a quote you understand.

Request an estimate →
Call us Email us